The U.S. Shipping Board’s Emergency Fleet Corporation documented experiments in building ships from different materials during and after World War I. NARA places Concrete Ship Section plans from 1918–1919 and building, testing and performance records from 1917–1921 in Record Group 32. Those holdings do not mean every design became a completed vessel. A ship plan can establish an engineering proposal; a construction record can document work; a trial or performance report can show a particular test. None is automatically a passenger list or a complete record of the people who built and crewed a ship.
The useful research question begins with a particular drawing, ship name if recorded, company, yard or date. Then ask what later documentary stage actually survives for that same design. Early designs may have been revised, canceled or applied to another hull, while later operational histories may sit under another agency. For family research, avoid placing an ancestor aboard a vessel merely because a construction project operated near the person’s home. The plan-to-trial pathway provides a more precise and testable history.
Find the Concrete Ship Section in RG 32
Search NARA RG 32 for the Ship Construction Division and section 32.4.2. The Guide identifies building, testing and performance records for both the Concrete Ship Section and the Wood Ship Section, 1917–1921. It separately describes 90 concrete ship plans, 1918–1919, among the architectural and engineering plans. Keep these groups distinct from the much larger Technical Section ship plans and the Steel Ship Section’s camouflage drawings. A broad search for “Shipping Board plans” may return a different material type or a later commercial vessel unrelated to your concrete-hull research.
Obtain the series and, where available, drawing-level identifiers before interpreting a sheet. Inspect the title block for ship name or project number, drawing date, stated scale, revision history and specific view. A hull section and an overall vessel arrangement are different technical documents. The Guide lists holdings, not a guarantee that each plan includes every engineering measurement or that a named ship can be read from all sheets. Ask whether the current holder has an index linking plan numbers to textual case files. Do not invent such a cross-reference if it is absent.

Separate Design Status From a Completed Hull
The strongest initial claim from a dated plan is that someone prepared or kept a proposed configuration. On the same project, multiple drawings may represent successive revisions. The existence of a plan neither confirms an order to build nor that a hull reached the water. Compare contract records, construction progress reports, yard correspondence, launch documentation and official vessel lists if these are found. Record which source proves each stage. A structural test carried out on a sample or model is not equivalent to successful service by a finished ship.
Pay attention to dates in the shipbuilding program. A 1918 sheet could be used after that date or superseded shortly thereafter. The 1917–1921 span for the Concrete Ship Section’s testing and performance records is the range for the record class, not proof a particular hull underwent trials every year. Keep plan date, reported construction milestone and trial date in separate columns. When one is missing, label it “not established” rather than inferring it from nearby entries or the general history of wartime shortages.

Check Trials and Operating Evidence Carefully
A reported trial can establish that a particular vessel or component was tested under stated conditions, but its scope must be read from the actual report. Distinguish a builder’s performance estimate from measurements after launch, and a test result from a later judgment on commercial usefulness. If the record does not state load, weather, power or duration, do not supply technical details from a different ship’s trial. References to vessel speed or fuel use must remain tied to the tested configuration and date rather than being repeated as permanent characteristics.
NARA describes other RG 32 holdings that may help after a concrete-hull identity is verified, including movement and operation-related reports elsewhere in the group. Those are possible research branches, not guaranteed links. A ship could be renamed, transferred or repurposed; use an official vessel number and contemporary chronology where available. A photograph labeled with the same name may have been taken after major modifications. Conversely, a plan never implemented should remain in a design-history narrative rather than being presented as a completed ship with invented voyages.

Preserve technical terminology from the period, including the difference between a shell, structural detail, cargo arrangement or capacity drawing. A modern artist’s reconstruction may be helpful for explanation, but it is not an original engineering plan and must not be passed off as one. If you redraw a section, label it an editorial diagram outside the historic record citation and retain a link to the authentic sheet.
Trace People Without Turning a Plan Into a Roster
Shipbuilders, inspectors, engineers, trial crews and later operating crews represent separate groups. A project correspondence file may mention a designer, while a yard payroll may document a worker and an operating crew agreement may name a seaman. None can be inferred from a plan’s existence. If researching an ancestor, establish where the person worked or served on a dated record, then test whether the identified concrete ship was at that yard or operating at that time. A shared employer or town alone does not establish participation in one vessel’s construction.
Prepare a final research table with plan identifier, vessel or project name as written, drawing date, verified construction event, verified trial and named people actually documented. Cite every claim using its own item reference. A bounded conclusion may confirm that a concrete-hull design was drawn in 1918 without locating evidence of construction; that is a genuine historical finding. If a completed hull is supported by a later record, state that separate result and the source proving it. Avoid collapsing concept, launch, trial and commercial voyage into one unsupported sentence.
When two archival series reference the same vessel name, check whether the names were unique or later changed. Copy the full title block and any official identifier before connecting a construction report to a trial. The name alone may be insufficient, and a maritime newspaper article could describe a ship of another material. Keep a rejected-match log so a future researcher can see why each candidate was accepted or excluded.
More Records and Archives Guides
How We Research These Archival Claims
We used the NARA RG 32 Ship Construction Division description to identify the exact 90-plan group from 1918–1919 and the separate 1917–1921 building, testing and performance records. The Cartographic Branch’s ship-plan instructions establish how to search drawings. Neither published description guarantees that a named vessel was completed or tested.
Read NARA RG 32, then consult ship-plan research guidance and Catalog instructions for the actual series and original item. See our affiliate disclosure; no commercial record access is promised.
NARA lists 90 Concrete Ship Section plans dated 1918–1919 in RG 32.4.2.
The Guide lists building, testing and performance records for the section covering 1917–1921.
No. Seek a construction, launch or acceptance record for the same project.
No. A trial documents only the tests and conditions actually recorded.
Not without a separately named employment or project record matching the worker and date.