A drawn monument may never have been installed. WORK 35 is described by The National Archives as the Office of Works and successor departments’ plans and drawings for statues and memorials, dating from 1821 to 1958. In this guide, the record is treated as an archival source with explicit proof limits: the catalogue can locate a document, while the original and an independent source establish what can responsibly be claimed. You can use the following worksheet-style route even if the person or building you are tracing has not yet been identified.
Begin With the Monument and Historical Site
WORK 35 is described by The National Archives as the Office of Works and successor departments’ plans and drawings for statues and memorials, dating from 1821 to 1958. It is a promising record set when the question concerns a government-associated commemorative design, proposed siting, pedestal or alteration. It is not a complete gazetteer of every monument in Britain. Many local memorials were commissioned and managed by bodies whose records lie elsewhere, so establish the responsible authority before treating WORK 35 as the only source.
Begin with what is known: name of a monument, honoree or event, present or former location, probable design date, and the public body that authorized work. Record historic street and park names as carefully as modern ones. A sculptor’s name may help, but signed attribution is not always available. The object of the search is to locate a drawing or file for a specific scheme, not to reconstruct an entire commemorated person’s family from a statue inscription.
Tell Survey Drawings From Proposed Designs
Architectural drawings can have very different purposes: a site survey describes existing conditions, a perspective proposes a visual effect, a plan sets out a footprint, and an elevation shows one face of an intended object. A revision can replace an earlier version without either necessarily being executed. The National Archives notes that many projects survive in only a handful of drawings. Therefore take each sheet on its own terms; a polished design is not evidence of government approval or actual installation.
Create a drawing ledger that includes the full WORK 35 reference, title, date or date range, scale if supplied, author or drafter if identified, location and revision mark. State “undated” where the sheet itself does not support a specific year. Look for annotations such as “alternative,” “proposed,” “approved,” or “existing,” but transcribe rather than silently normalize them. If a drawing is a later copy, distinguish the copy’s production date from the design date it depicts.

Do Not Infer Approval From a Catalogue Match
Discovery searches archival descriptions, which may summarize a set of drawings without listing every inscription or contributor. A keyword hit under WORK 35 gives a route to a possible physical record; it does not validate the design narrative printed in a secondary source. Open the detailed catalogue description and inspect the original or authorized copy where access permits. If the online description is broad, search by place, architectural feature, commemorated subject and successor Office of Works terms rather than relying on a surname alone.
If two designs appear to show the same monument in different settings, resist choosing the more attractive image as the built result. Compare plan orientations, boundaries, base dimensions and annotations to identify whether one is a relocation proposal, alternate competition submission or later alteration. The official architectural-drawings guide emphasizes partial survival across departments; other records may contain correspondence, approvals or costs. Those supporting records should be cited independently rather than imagined as attachments to a drawing.
Prove What Stood in a Place and When
The strongest completion test joins a proposal to independent contemporary evidence: a municipal or departmental minute, construction account, dated photograph, newspaper report of an unveiling, or later maintenance inventory. An unveiling report confirms an event as reported; it does not necessarily establish the date of fabrication. Conversely, an earlier contractor’s invoice may show commissioned work without demonstrating that the monument was erected on the planned site. Each event belongs in its own row with its original date.
A monument’s present appearance can differ from its first installation through repairs, replacement of figures, relocation or removal. Photograph the visible inscription and any modern interpretive plaque but do not treat those as substitutes for original documents. An inscription may preserve a curated commemoration rather than a full list of participants, and it does not establish family relationships among names appearing together. If a historically documented scheme never reached construction, that is a useful and honest conclusion, not a failed research result.

Cite the Sheet and Explain the Interpretation
Build a citation that takes another researcher to the actual sheet: The National Archives, WORK 35 piece and any item, drawing title, attributed drafter, date as written, and any verso or annotated revision. Record the descriptive label separately from your observation of the image. The same monument may have drawings held in local archives or institutional collections; make clear which repository holds each source. A catalogue item, an image file and a later book illustration are different versions of evidence.
Finish with a short claim audit. “The Office of Works preserved a proposed pedestal drawing” is supportable when the sheet says so. “The statue was unveiled at that location” needs a dated inauguration or installation source. “The people named on the monument served together” needs original person-level evidence, and sometimes the monument is symbolic rather than a roster. This discipline helps preserve both local history and the accuracy of family stories without erasing the uncertainty of incomplete archival series.

More House and Local History Guides
How We Research Original Documents and Their Limits
This research route relies on original institutional guidance, not an invented visit to an individual archive piece. The topical source is The National Archives research guide; record-finding limits are explained in Discovery search guidance; and the citation standard is described in The National Archives citation guidance. We have not inferred that a particular person or project appears in an unseen piece. The accompanying scenes and diagrams are newly composed explanatory illustrations, not reproduced historic documents.
Before citing a conclusion, keep separate the catalogue description, the original document as inspected, your literal transcription, and the independent evidence used to test identity or outcome. Record spelling variants and failed searches, including the date and scope of each attempt. Avoid assuming that everything in a surviving series is individually keyword indexed or digitally accessible. The site’s affiliate disclosure explains relationships and funding; these steps do not depend on an unverified commercial service or a fabricated referral.
No. It covers Office of Works and successor plans; local and privately managed monuments may be elsewhere.
No. An unveiling requires contemporary ceremony reporting, minutes or similar event evidence.
Try it, but also search place, monument name and design terms because drawings may be indexed broadly.
Record each date, scale and annotation; treat them as design stages until construction evidence distinguishes the result.
No. It is evidence of commemoration or the wording inscribed, not an independent pedigree.
